WHAT

WHO

HOW MUCH

HOW

PROGRAM
FINANCING
ABSOLUTE DIMENSIONS
RELATIVE DIMENSIONS
DESIGN STRATEGY

SURFACE EXTENSION

SURFACE REDUCTION

VOLUME EXTENSION

VOLUME REDUCTION

STRUCTURE

MATERIAL

IMAGE

84 PROJECTS

Variation of modes of use: functions, users, schedules, etc.

Relationship between the ownership and the form of the investment that allows the transformation

Variation of the overall dimensions of the building

Proportional relationship between new spaces and existing spaces

Relationship between the structural adjustments and the existing structure

Relationship between the forms and types of pre-existing materials and those of the new intervention

Relationship between the image of the new and the image of the existing (mimesis / contrast)

Emba_Estudi Massip-Bosch Arquitectes – Place De La République Renewal, Leucate


PROJECT - Main Infos

PROJECT: Emba_Estudi Massip-Bosch Arquitectes – Place De La République Renewal, Leucate

LOCATION: Ville de Leucate (France)

YEAR: 2007

ARCHITECT / FIRM: EMBA_ESTUDI MASSIP-BOSCH ARQUITECTES

BUYER: MAIRIE DE LEUCATE - LEUCATE MUNICIPALITY

SURFACE: 3.228 sqm

PRICE: € 750.000

DESCRIPTION:
The space of the square is a very elongated rectangle which has as its main attribute a marked fault line along its whole length, generating two different levels. Our design converts what was originally a barrier into a connecting element capable of restoring unity to this central space of Leucate. The element generating this new relationship and structuring the whole project is a giant molding that runs along the square resolving all topographic differences at a single stroke and facilitating transversal connections. The rest of the urban elements subordinate to the molding, thus reinforcing its structuring character. The molding, besides, facilitates the active use of the piazza by means of its stepping form, creating terraces, benches, or stairs, allowing for different simultaneous activities. It configures four main areas: a representational area at the piazza’s; a conviviality area with café terraces; an area of social events, wider and prepared for different uses; and an intimate area, under a new plantation of trees and grass at the back of the square, where the slope is steeper. Night lighting is a crucial element of the design. General illumination is done by specifically designed multifocus posts. It is complemented by a low-set series of led strips that beat according to the rhythm in the piazza: sound sensors measure the ambient noise and increase the beating rhythm when there is more activity, while get to a very slow beating in the quieter moments, like the calm breathing of a sleeping person. The success of this intervention has to be credited to the political courage of the city government which, having originally the opposition of part of the population, it adopted our proposal of completely pedestrianizing the piazza, which had been used for decades as a parking lot. Today, like in so many similar cases, there is no way back in the social reappropriation of this public space.

WHAT - Program


TOTAL REPLACEMENT / DISCONTINUITY: The new functional program has completely replaced the original one.

DESCRIPTION:
Complete pedestrianization for public uses of a piazza used for decades as a parking lot.

WHO - Financing


TOTAL CONSERVATION / CONTINUITY: The investor is the property owner.

DESCRIPTION:
City council of Leucate is the developer & investor.

HOW MUCH - Absolute Dimensions

- SURFACE present NO VARIATION,

TOTAL CONSERVATION / CONTINUITY: The overall dimensions are equal to the pre-existing surface.

- VOLUME present NO VARIATION,

TOTAL CONSERVATION / CONTINUITY: The overall dimensions are equal to the pre-existing volume.

DESCRIPTION:
-

HOW MUCH - Relative Dimensions


TOTAL REPLACEMENT / DISCONTINUITY: The new spaces have completely replaced the existing spaces.

DESCRIPTION:
-

HOW - Design Strategy STRUCTURE


TOTAL REPLACEMENT / DISCONTINUITY: The original supporting structure has been completely replaced by a new structure.

DESCRIPTION:
-

HOW - Design Strategy MATERIAL


TOTAL REPLACEMENT / DISCONTINUITY: The materials chosen for the new intervention are completely different from the pre-existing ones.

DESCRIPTION:
-

HOW - Design Strategy IMAGE


TOTAL REPLACEMENT / DISCONTINUITY: The new intervention is in total contrast with the existing structures.

DESCRIPTION:
-